Skip to content

Engineering jobs (English)

Analysis, design, requirements and documentation for any engineering discipline (software, mechanical, civil, electrical, process, industrial). Greek version: el/03.

Safety rules for engineering use

  • Confidential designs, source code, customer data and export-controlled information must not go into a free consumer tool. Use fictional or generic examples.
  • AI never replaces calculations, standards, testing or sign-off by a qualified engineer. In safety-critical work, treat every number as unverified until you check it.
  • Ask the AI to separate facts from hypotheses, to state assumptions, and to say what you must verify.

LIVE prompt (runs in class, fictional case)

ROLE: Act as a senior reliability engineer facilitating a blameless root-cause analysis.
CONTEXT (fictional): A pump skid trips about twice a week, mostly at night. Logs show a high-vibration alarm about 10 minutes before each trip. Ambient temperature drops at night. Recent change: a new seal supplier. Operators restart the skid without inspecting it.
TASK: Produce (1) a 5-Whys chain with 2 branches, (2) a fishbone list by category (people, method, machine, material, environment, measurement), (3) the 5 cheapest tests to confirm or reject the main hypotheses, (4) one first containment action.
FORMAT: Compact tables. Maximum 220 words.
CHECK: Separate FACTS from HYPOTHESES. If you need more data, ask up to 3 questions at the end.

You should see

Hypotheses such as seal or alignment problems and thermal contraction, each with a cheap test (for example a vibration trend check, a seal inspection, a night-versus-day comparison), a containment action such as an inspection before restart, and clearly labelled facts versus hypotheses.

Prompt pack (after class)

2. Design decision record and trade-off analysis

ROLE: Principal engineer writing a design decision record.
CONTEXT: Decision: [e.g. which sensor, material, cloud service or structural solution]. Options: [A, B, C]. Constraints: [cost, safety, standards, lifecycle, team skills].
TASK: First ask me to confirm the criteria weights. Then write: context, options, weighted criteria table with scores, risks, a recommendation, how reversible the decision is, and what new information would change it.
FORMAT: Headings and one scoring table.
CHECK: Do not invent specifications. Write [SPEC NEEDED] where data is missing.

3. Requirements to acceptance criteria and tests

ROLE: Systems engineer and test lead.
CONTEXT: The requirements are below.
TASK: For each requirement, check that it is clear, testable and atomic. Flag problems and rewrite it. Then give acceptance criteria and test cases (normal, boundary, failure) and the verification method (inspection, analysis, test, demonstration).
FORMAT: A table: ID | problem? | rewrite | acceptance criteria | tests. Then list up to 5 ambiguity risks and missing requirements.
CHECK: Do not add requirements silently; list them separately as suggestions.
REQUIREMENTS: [paste]

4. Independent sanity check of a calculation

ROLE: Independent checker, an engineer in [DISCIPLINE].
CONTEXT: My calculation: inputs [..], units [..], method [..], result [..]. Applicable standard (if known): [..].
TASK: Do NOT redo the design. Audit it: unit consistency, an order-of-magnitude estimate, hidden assumptions, missing load cases or safety factors, sign and direction errors, and which clauses of the standard I should re-read. Give a quick independent estimate and show the method so that I can compare.
FORMAT: A checklist with PASS, CHECK or FAIL for each item.
CHECK: State your uncertainty. Mark everything that must be verified by a licensed engineer.

5. Handover pack and risk register

ROLE: Technical writer and risk engineer.
CONTEXT: System: [description]. Audience: [operations / maintenance / client]. Raw notes: [paste].
TASK: Create (1) a one-page handover summary, (2) an operating and maintenance checklist, (3) an FMEA-style risk register (failure mode, effect, cause, severity, occurrence and detection estimated from 1 to 10 with your reasoning, recommended action), (4) an open-issues list.
FORMAT: Four labelled sections.
CHECK: Mark every rating as DRAFT for team review. Do not invent data.